Conflict-Predictive Variable Horizons in Multi-Drone Distributed Model Predictive Control
Published 16 Sept 2026arXiv:2609.13270
Updated 12 h ago · first seen 15 Sept 2026
paper_01M2JK197KXPYWGRY6J9R6PDHP
Abstract
In distributed model predictive control for multi-drone collision avoidance, a fixed prediction horizon forces a compromise: a short horizon is inexpensive but reacts late to approaching neighbors, whereas a long one anticipates conflicts at a per-step cost that grows superlinearly with its length. We propose a conflict-predictive variable horizon that each drone sets locally, leaving the distributed model predictive control itself unchanged. From a short history of observed positions, a drone extrapolates the flight lines of its neighbors, tests each against its own using confidence funnels that narrow with prediction range, and obtains each time to conflict in closed form. The horizon is then the smallest admissible value whose planning window covers the farthest predicted conflict. It collapses to its minimum in clear airspace and grows only when a conflict lies ahead. Provided this minimum meets a single computable feasibility bound, we prove that recursive feasibility and asymptotic stability are preserved for every horizon the policy can select. These guarantees hold for a linear model, and a cascaded inner loop reduces each quadrotor's translational dynamics to a perturbed double integrator, so they carry over to the linearized quadrotor model and, as practical stability, to the full nonlinear one. In simulation on dense antipodal-swap benchmarks, the variable horizon reduces both per-step solver cost and total computation well below those of a long fixed horizon, and it maintains separation in every run, which a short fixed horizon of comparable per-step cost does not.
Organizations
Organizations 0
No organization stated. arXiv metadata does not carry affiliations; an organization is linked only when a model card or lab page cites the paper.
Models
Models introduced or described 0
Inbound described_by relations from model cards and documentation.
No model links this paper yet
Datasets
Datasets used 0
No dataset relation recorded.
Benchmarks
Benchmarks used 0
No benchmark relation recorded.
Code
Repositories & frameworks 0
No repository linked.
Timeline
Timeline 2
- Property changedPaperConflict-Predictive Variable Horizons in Multi-Drone Distributed Model Predictive Control
Conflict-Predictive Variable Horizons in Multi-Drone Distributed Model Predictive Control: published at changed from 2026-09-15T04:00:00+00:00 to 2026-09-16T04:00:00+00:00
Published15 Sept 2026→16 Sept 2026arxiv - New paperPaperConflict-Predictive Variable Horizons in Multi-Drone Distributed Model Predictive Control
New paper: Conflict-Predictive Variable Horizons in Multi-Drone Distributed Model Predictive Control
arxiv
Sources
Sources 1
Tier 1 = official/primary, 2 = quality secondary, 3 = community, 4 = unverified. Every snapshot is archived; see all sources and the methodology.