Planning and Scheduling Business Processes under Control-Flow Uncertainty: Extended Version
Published 12 Sept 2026arXiv:2609.05578
Updated 3 h ago · first seen 12 Sept 2026
paper_01M29X355ABYF3QBW6V1J5MGFY
Abstract
Scheduling activities in business processes can improve efficiency (e.g., reduce makespan), but is challenging because the exact sequence of activities required to complete a case is often uncertain due to decisions based on data that emerges during execution. Nevertheless, probabilistic information regarding such decisions can often be estimated or derived from historical execution logs, and can help anticipate which execution paths are likely to lead to successful completion. Planning with particular execution paths affects feasibility, i.e., the probability of successful completion, and the expected number of superfluous activities that are planned but never executed. We frame the problem as a chance-constrained optimization problem and present two formulations: A decomposed approach with two stages, a planning stage that minimizes the expected number of superfluous activities subject to a feasibility constraint, and a scheduling stage that minimizes the makespan over the planned activities; and an integrated approach that combines planning and scheduling into a single formulation. Evaluation on two real-world and one synthetic dataset shows that the integrated approach yields superior makespans but is intractable at scale, while the decomposed approach scales to large settings.
Organizations
Organizations 0
No organization stated. arXiv metadata does not carry affiliations; an organization is linked only when a model card or lab page cites the paper.
Models
Models introduced or described 0
Inbound described_by relations from model cards and documentation.
No model links this paper yet
Datasets
Datasets used 0
No dataset relation recorded.
Benchmarks
Benchmarks used 0
No benchmark relation recorded.
Code
Repositories & frameworks 0
No repository linked.
Timeline
Timeline 1
- New paperPaperPlanning and Scheduling Business Processes under Control-Flow Uncertainty: Extended Version
New paper: Planning and Scheduling Business Processes under Control-Flow Uncertainty: Extended Version
arxiv
Sources
Sources 1
Tier 1 = official/primary, 2 = quality secondary, 3 = community, 4 = unverified. Every snapshot is archived; see all sources and the methodology.